Project 16

Heavy Substructure

December, 2014

Additional equipment production

Design, manufacturing and testing of various additional equipment and systems for on-shore drilling and workover rigs. This heavy substructure has a loading capacity of over 250t. All raising and lowering systems are hydraulically powered and can be set to three different heights to suit the required specifications. Designs were tested and calculated using the latest finite element analysis softwares and approved by third party consulting and certification agency, Bureau Veritas.


Gallery